Introducing our Modular School Building Solution—a revolutionary approach to modern, sustainable education infrastructure. The Jiangyin Garden Experimental Primary School project exemplifies innovation, combining speed, safety, and eco-friendly design to meet urgent educational needs.
Key Features:
✅ Rapid Construction: Built in just 56 days (July 1–August 25, 2023) with 46 prefabricated steel modules, reducing on-site construction time by 70% compared to traditional methods.
✅ Eco-Conscious Design: Utilizes lightweight steel frames, structural-insulated panels, and recyclable materials (A1-grade fireproof finishes, bamboo-integrated walls) to cut carbon emissions by 80% and construction waste by 80%.
✅ Safety & Compliance: Meets national standards for seismic resistance (7-degree fortification), fire safety, and environmental thresholds. Third-party air quality tests confirmed superior indoor safety, far exceeding school requirements.
✅ Smart Functionality: Noise-reducing双层保温墙板 (double-layer insulation), anti-slip flooring, and energy-efficient layouts ensure a distraction-free, comfortable learning environment.
✅ Adaptable & Reusable: Modules are 100% factory-prefabricated, enabling easy disassembly, relocation, and reuse (70% repeatability) for evolving campus needs.
Why Choose Us?
- BIM-Driven Precision: From design to delivery, our digital workflows guarantee seamless integration and quality control.
- Cost-Effective: Save 60% on labor and 80% on site storage while achieving permanent-grade durability.
- Aesthetic Integration: Customizable exteriors blend with existing campus architecture, featuring weather-resistant façades and sun-shielding designs.
Perfect For: Rapid expansion of classrooms, offices, and multipurpose spaces—ideal for schools prioritizing sustainability without compromising safety or style.
Transform education spaces faster, greener, and smarter. Explore modular excellence with Zhijian Meizhu—where innovation builds brighter futures. 🌱🏫